Skip to main content

Halo Solar Systems

People love clarity—and solar should feel clear, not confusing. Here’s a simple, realistic week-by-week timeline for a typical rooftop solar installation in Bhopal, from survey to net meter and subsidy steps. (Exact dates can vary depending on approvals and DISCOM scheduling.) (Press Information Bureau)


Week 1: Roof survey + system sizing + document readiness
Points:

  • Roof visit to check shade, space, and panel placement
  • System size suggestion based on your bill (kW sizing)
  • Finalize your goal: bill savings only (on-grid) or backup (hybrid)
  • Keep documents ready (bill, ID, bank details) so your portal work doesn’t get stuck later (Press Information Bureau)

Small tip: Take 2–3 clear roof photos (wide angle) + your latest electricity bill. It speeds up the survey and proposal.


Week 2: Portal application + feasibility/approval stage
Points:

  • Apply through the National Portal: register, fill details, and submit your rooftop solar application (Press Information Bureau)
  • Wait for DISCOM feasibility approval (this step is required before installation under the standard process) (Press Information Bureau)
  • Choose a registered vendor and lock the installation schedule after approval (Press Information Bureau)

Note for Bhopal: The DISCOM region for Bhopal is typically under MPMKVVCL (Madhya Pradesh Madhya Kshetra Vidyut Vitaran Co. Ltd.). (MPCZ Web Apps)


Week 3: Installation + testing (your solar goes live on the roof)
Points:

  • Structure mounting + panel fixing
  • Inverter installation + wiring + safety protections
  • Basic testing + system handover
  • Monitoring app setup (if included) so you can track daily units

Installer should share: system specs (kW, panel count), warranties, and do’s/don’ts at handover.


Week 4: DISCOM inspection + net metering + commissioning steps
Points:


Where delays usually happen (and how to avoid them)
Points:

  • Name mismatch between bill/ID/bank (most common)
  • Blurry uploads (cut corners, unreadable consumer number)
  • Roof access or inspection scheduling delays
  • Missing safety items in installation causing inspection rework

Important Note:
Most delays happen due to document mismatch or inspection scheduling. Clean paperwork + clear uploads reduce the wait and help you start saving sooner. (Press Information Bureau)



Get a timeline plan with your roof survey booking. Share your latest bill + roof photos, and get a week-by-week plan (survey → portal → install → inspection → net meter).

Halo Solar Systems

Address:

Block 2, Chetak Complex, Zone 2, MP Nagar, Bhopal, Madhya Pradesh 462011

Phone Number:

9111328840

GMB Profile Link: https://maps.app.goo.gl/w9CsAgw3hCZXUG829

Leave a Reply

Your email address will not be published. Required fields are marked *

Call Now